Designed as part of Christchurch’s post-earthquake regeneration, Ao Tawhiti Unlimited Discovery provides a flexible, contemporary learning environment designed to encourage collaboration and innovative approaches to education.
Our prefabricated reinforcing solutions streamlined construction, helping deliver one of Christchurch's most innovative educational developments efficiently and safely.
The project required the fabrication, supply and installation of approximately 350 tonnes of reinforcing steel. A key element of the reinforcing works was the off-site prefabrication of a 2.5-metre-wide horizontal reinforcing beam, which was delivered to site ready for installation. This approach helped reduce on-site labour, improve construction efficiency and support the project programme.
Careful planning, prefabrication and coordination with the wider construction team contributed to the successful delivery of reinforcing steel for this significant education project.
Reinforcing steel fabrication, supply and installation services support commercial, education and infrastructure projects throughout New Zealand. Combining off-site prefabrication with efficient on-site installation can help reduce construction time, improve site efficiency and deliver high-quality reinforcing solutions for complex structural projects.